YOUR STEP BY STEP GUIDE TO STAMPED CONCRETE AND A BEAUTIFUL LANDSCAPE

  • Connector.

    Get in Touch

    and we’ll meet to…
    – explain the process
    – take measurements
    – offer inspiration
    – detail your requirements

  • Connector.

    Start Date

    Making sure you’ve received your paperwork and are happy , we’ll pencil in a start date in for you.

  • Connector.

    Site Preparation

    The base will be prepared and MOT Type 1 will be used to achieve a well compacted and flat base…

    Any drainage requirements are handled and all manhole covers, drains and channels are set to the correct level and fall.

  • Connector.

    Pouring Concrete

    We’re on site for the arrival of concrete by our ready-mixed lorry.
    Once the colour is set the concrete is then imprinted with the chosen pattern whilst the site is cleaned.

  • Connector.

    Cutting Joints

    After the concrete has been laid we will return to the site the following day to cut out the contraction joints using a petrol disc cutter and a diamond blade.

  • Connector.

    Cleaning Up

    The Release Agent powder is washed off after the contraction joints are inserted.

    The site is then pressure washed so your property is left clean and tidy.

  • Connector.

    Finishing Up

    After being washed the paving must be thoroughly dry prior to sealing.

    Before sealing silicone filler is applied to the joints to inhibit dirt build up and weed growth.

GET IN TOUCH BY PHONE OR EMAIL

GET IN TOUCH BY PHONE, EMAIL OR FORM!

GET IN TOUCH